Pre-Engineered Building
(PEB) Solutions
Cost-effective, rapid-deployment structural engineering for modern industry. We deliver high-performance steel buildings tailored to your operational needs.
Smart Engineering Advantages
Speed of Construction
Components are pre-fabricated off-site, reducing construction timelines by up to 50% compared to traditional concrete buildings.
Design Flexibility
Easily expandable and customizable layouts. Achieve massive clear spans without internal columns hindering operations.
Lower Lifecycle Cost
Reduced foundation loads, low maintenance requirements, and energy-efficient insulation options lower total cost of ownership.
Structural Integrity
Engineered to withstand severe weather conditions, seismic loads, and heavy industrial usage with high-tensile steel.
Engineered to Perfection
Our PEB systems are composed of several distinct components that work in unison to provide a rigid, durable structure. We use high-grade ASTM steel plates and cold-formed sections.
Standard Design Codes
- AISC / MBMA Guidelines
- IS 800:2007 (Limit State Method)
- IS 875 (Wind & Seismic Loads)
Primary Members
The main load-bearing frames. These rigid frames are fabricated from high-grade steel plates (Yield Strength 345 MPa). They consist of built-up "I" sections.
Secondary Members
Cold-formed "Z" and "C" shaped sections that support the roof and wall sheeting. They transfer loads to the primary frame and act as struts.
Sheeting & Cladding
High-tensile steel sheets (Yield Strength 550 MPa) with Galvalume or Color-coated finish. We offer various profiles for roofing and wall cladding, ensuring leak-proof performance and superior aesthetics.
Concept to Erection
Consultation & Estimation
Analyzing client requirements, site conditions, and budget to provide a preliminary proposal.
Structural Design & Drafting
Creating detailed GA drawings and fabrication drawings using advanced software (Staad Pro, Tekla).
Factory Fabrication
Cutting, welding, and painting of steel members in our controlled factory environment.
On-site Erection
Safe and swift assembly of the building components at the project site by expert riggers.
PEB vs. Traditional Steel
Understanding the value proposition of Pre-Engineered Buildings.
| Feature | PEB Solution | Traditional Steel |
|---|---|---|
| Weight | 30% Lighter | Heavier |
| Delivery Speed | Average 6-8 Weeks | 20-26 Weeks |
| Foundation Cost | Lower (Simple Design) | Higher (Heavy Loads) |
| Expandability | Simple & Low Cost | Difficult & Expensive |
| Clear Span | Up to 90m | Limited |
Recent PEB Installations
Auto Component Factory
Heavy-duty crane beams (10T) integrated with mezzanine floors for office space.
Logistics Park Hub
Multi-span structure with standing seam roofing system for leak-proof assurance.
Private Hangar Facility
Wide clear span design with specialized extra-wide sliding door mechanisms.
Scale Your Infrastructure Today
Ready to build faster, smarter, and stronger? Contact our engineering team for a customized PEB proposal tailored to your industry.